Applied Digital Unveils 200MW Data Center in Texas: Expanding Blockchain and AI Infrastructure

TL;DR:

  • Applied Digital has launched a cutting-edge 200MW data center in Garden City, Texas.
  • This marks their third operational blockchain hosting facility in North America.
  • The company plans to reach a total hosting capacity of 480MW across its network.
  • Applied Digital’s facility supports Bitcoin mining and high-performance computing (HPC) for AI.
  • Bitcoin network’s energy demands have surged to 14.83 GW, emphasizing the industry’s scale.
  • The company’s unique model hosts rigs for other miners, generating substantial revenue.
  • Applied Digital is strategically shifting focus from Bitcoin mining to HPC and AI.
  • HPC is viewed as more profitable per unit of energy compared to Bitcoin mining.
  • Investors remain cautious despite Applied Digital’s strategic moves, with a 5.3% stock decline.

Main AI News:

In the realm of cutting-edge technology infrastructure, Applied Digital is making waves as a prominent blockchain and artificial intelligence (AI) solutions provider. This innovative company has just unveiled its latest milestone: a state-of-the-art 200-megawatt (MW) data center located in Garden City, Texas. The inauguration of this facility signifies a significant stride for Applied Digital, as it becomes the third operational blockchain hosting center within North America’s borders.

With its sights set on the future, Applied Digital is well on its way to achieving a grand vision. Their recent announcement reveals that, once fully operational, this Garden City location will bolster their total hosting capacity to a remarkable 480MW across their network of blockchain hosting facilities. To put this magnitude of power into perspective, a single megawatt (MW) equals a million watts, while a gigawatt (GW) translates to a billion watts. In comparison, Riot Blockchain, a publicly traded Bitcoin mining company, boasts a colossal 1GW mining facility right here in the same Texan state.

For context, consider that a standard household light bulb typically runs on a modest 60 watts of power. In stark contrast, the entire Bitcoin network’s energy consumption is estimated at a staggering 14.83 GW, as per Cambridge’s latest figures, a substantial increase from the 12.89 GW estimate recorded just last September. The bulk of this energy is harnessed by Bitcoin miners to generate the intricate hashes necessary for constructing the network’s next block of transactions. Miners are handsomely rewarded with freshly minted BTC for their crucial contributions.

Bitinfocharts data suggests that Bitcoin’s current hashrate stands at an impressive 400 exahashes per second (EH/s). To put this in perspective, an exahash is equivalent to one quintillion hashes. Wes Cummins, Chairman and CEO of Applied Digital, shares insights into their facility’s capabilities. Depending on the specific models of miners employed, the facility is geared to support a formidable 7 to 8.5 EH.

Remarkably, all this hashrate doesn’t serve Applied Digital’s mining needs. In a unique business model, Cummins emphasizes that their company exclusively accommodates “other miners.” Essentially, other firms own the mining rigs that Applied Digital houses and operate on their behalf. This distinctive approach has proven highly lucrative, as the company raked in a substantial $22 million in revenue during the quarter concluding in May 2023.

However, like many pioneers in the mining industry, Applied Digital is steering its focus away from Bitcoin mining. Instead, the company is redirecting its energy and resources toward high-performance computing (HPC), a sector that also demands substantial power but serves as a vital support system for the burgeoning AI industry. Notably, HPC requires access to colossal data centers, efficient cooling systems, and cost-effective energy sources to operate profitably. According to Adam Sharp, Director of Research at HIVE Digital, HPC-cloud services promise significantly higher profitability per unit of energy when compared to Bitcoin mining.

Applied Digital is unequivocal in its shift towards this promising sector. As Cummins asserts, “We are focusing all new expansion on HPC/AI workloads.” However, it appears that investors are taking a cautious stance, at least for now. Despite these ambitious moves, Applied Digital’s stock, listed on the NASDAQ under the ticker APLD, experienced a 5.3% decline in value on Friday.

Conclusion:

Applied Digital’s expansion into the Texas data center market showcases its commitment to advancing blockchain and AI infrastructure. The shift from Bitcoin mining to high-performance computing reflects a strategic pivot in response to changing market dynamics and energy demands. While the market holds promise, investor sentiment remains cautious, suggesting that the company’s success in the evolving landscape will be closely monitored.

Source